Overseas Recycle Operation, United Arab Emirates

Overseas Recycle Operation, United Arab Emirates

A joint venture with Lippmann Milwaukee, TPS (our parent company) and ABC engineered, designed, fabricated, shipped, installed, wired and automated this 1,000 ton per hour state of the art Concrete Recycling plant. After two Lippmann Jaw primary crushers the material starts its recycle process with two 60” tricked belt conveyors with two 60” electro magnets. The material then feeds onto two 60’ long picking conveyors located in an air conditioned two story enclosures that was a part of this total package. More processing then takes place as the material goes up to the dual 8’ x 20’ DD screens. The oversize product is conveyed to dual 4’ cone crushers seeing another magnet separator on the way. This re-crushed material then goes into a 100 ton surge bin which feeds back to the dual screens, closing the circuit. The finish product goes to a tele-a-stacker via mobile piggy-back conveyors.

This plant was commissioned and started full production in May of 2010.